Shelter construction update
The floor has been poured.
Shelter floor 12-21.jpg
The kennel windows are clear and set too low to ground level. Some form of screening will be required to prevent visitors from looking inside and disturbing the dogs, or preventing dogs from looking outside, becoming distressed and barking excessively.
Shelter windows.jpg
https://www.speakupwny.com/forums/at...4&d=1636833928